| |
Digging
the Pipe Trench
Backhoes and trenching machines cut a two-meter deep trench for
the 760 millimeter diameter pipeline that carries the crude oil.
The corrosion-protected pipe, made of high quality steel, lies buried
beneath a meter of soil that helps protect it from damage or tampering.
|
|