PHOTO ALBUM:
Chad Inauguration Ceremony
Cameroon Inauguration Ceremony
Oilfield Area
Pipeline System
Marine Terminal
Infrastructure Improvements
Consultation
Employment & Training
Local Business Development
Environmental Protection
Compensation
Worker Health & Safety
Community Safety
HIV/AIDS
Roll-Back Malaria
Food, Water, Shelter
Healthcare, Education, Transportation
Pipeline System
Custom Fitting the Pipe to the Terrain
This special team has entered the trench with welding equipment to join two lengths of pipe at a location where the pipeline had to be specially formed and constructed to make a turn and climb a steep hill.
Photo credit: Esso Photo
CLOSE WINDOW