|
Improved earnings in spite of lower copper price.
Record copper production of 248 thousand metric tons.
Achieved a 20-percent increase in production of higher-value copper blister and cathode.
Reduced unit costs 13 percent. (1)
Expanded the Los Bronces copper cathode production capacity by 4 thousand metric tons per annum.
|